How does a huge machine leave a finished tunnel behind it?

A tunnel boring machine does much more than make a hole. The shield machine shown here works through suitable soil while helping support the space it opens. A large cutting head at the front rotates and loosens material.

M47 visual explanationThis earth-pressure-balance shield coordinates cutting and face support, soil removal by screw and conveyor, and assembly of concrete lining rings. Highlighting one part does not switch the other tasks off.A moving construction site undergroundSchematic earth-pressure-balance shieldLining ringsCutting headConveyorScrewSupported faceSoil travels outSupport, removal and lining are coordinated

In the diagramA moving construction site undergroundSchematic earth-pressure-balance shieldLining ringsCutting headConveyorScrewSupported faceSoil travels outSupport, removal and lining are coordinated

The cutaway shows the cutting head and supported soil chamber at the front, soil removal along the machine, and concrete lining rings behind it.

Behind the cutter is a chamber containing excavated soil. Carefully controlled pressure in this chamber helps hold up the ground at the tunnel face. The strong outer shield surrounds the working area immediately behind it.

The loosened material, called spoil, must leave the tunnel. A screw carries it out of the chamber, and a conveyor transports it toward the surface. Removing material and advancing the machine are coordinated so that support at the face is maintained.

Behind the shield, an erector places curved concrete pieces into complete lining rings. The rings form the tunnel wall left behind as the machine advances. Other tunnel boring machines use different arrangements for different ground. Cutting, support, spoil removal and lining must work together for this remarkable moving construction site to make progress.

About this explanation

Starting knowledge: Understand a rotating cutter, a conveyor and a protective wall.